The Ministry of Energy and Infrastructure has announced the temporary closure of Al Dhaid Road Bridge No. 7 on Emirates Road for construction works in two phases.
The first phase of closure will take place from February 14 to February 15 between 12:00 am to 8:00 am, while the second phase will run between February 16 and February 17 during the same hours overnight.
Motorists are advised to plan alternate routes during the temporary closures.
نود إفادتكم بأنه سيتم إغلاق طريق الذيد عند الجسر رقم (7) على شارع الإمارات، وذلك ابتداءً من 14/02/2026 وحتى 15/02/2026، من الساعة 12:00 صباحاً وحتى الساعة 08:00 صباحاً للمرحلة الأولى
— وزارة الطاقة والبنية التحتية (@MOEIUAE) February 12, 2026
و من 16/02/2026 وحتى 17/02/2026، من الساعة 12:00 صباحاً وحتى الساعة 08:00 صباحاً للمرحلة… pic.twitter.com/Dle84ppTMu

6 missiles, 21 drones intercepted by UAE air defences on Monday
H.H. Sheikh Mohammed says over AED2.8 billion raised for 'Edge of Life' campaign
One dead after missile falls on vehicle in Abu Dhabi's Al Bahyah
Fire breaks out after drone hits Umm Al Quwain building
